Into The New 2021: Difference between revisions

From paperclip
Jump to navigation Jump to search
Dwilson (talk | contribs)
Cjackson1 (talk | contribs)
 
(6 intermediate revisions by 2 users not shown)
Line 83: Line 83:
Image:IMG 9285.JPG|''Flown pink wall''
Image:IMG 9285.JPG|''Flown pink wall''
Image:IMG_9287.JPG|''Very pink show''
Image:IMG_9287.JPG|''Very pink show''
Image:dance floor cleaning.JPG|''Cleaning the dance floor''
Image:ITN2.JPG|''Concert Rig''
Image:ITN2.JPG|''Concert Rig''
</gallery>
</gallery>
Line 139: Line 138:
==Sound==
==Sound==


==='''Design'''===
The design for Into the New 2021 was a very simple yet tricky system. Sound for the show was targeted at different streaming platforms and recording platforms. This meant that we did not use the main PA system for the show as it was not necessary. Instead we used 4x Gentec speakers which were hired from the warehouse in Glasgow as operator speakers. This allowed us to send a program feed to the Snd op, LX op, DSM and then a spare one was for assessors to have thir own feed for Performances. We then sent a Left and Right mix of the show to the camera operators for their recordings, this was without vocals however as a clean vocal channel was sent to a separate camera so that it could be mixed in post.
==='''Equipment List'''===
<pdf width="700" height="900">Into_the_New_Equipment_List_.pdf</pdf>


==Lighting==
==Lighting==

Latest revision as of 12:40, 24 May 2021


Into The New 2021
Summary
Performance Dates
2nd March - 13th March
Online Showing Dates
25th March - 28th March
Performance Course
4th Year Contemporary Performance Practice
Location
New Atheneum Theatre
Production Team
Production Manager
Technical Manager
Senior Stage Manager
Stage Manager on Book
Stage Manager on Book
Assistant Stage Manager
Assistant Stage Manager
Technical Stage Supervisor
Head of Flys
Assistant Technical Stage Supervisor
Assistant Technical Stage Supervisor
Assistant Technical Stage Supervisor
Assistant Technical Stage Supervisor
Assistant Technical Stage Supervisor
Assistant Technical Stage Supervisor
Lighting Designer
Production Electrian
Programmer
Lighting Technician
Lighting Technician
Lighting Technician
Lighting Technician
Sound 1
Sound Supervisor


Overview

Shows/ Cast

Stage Management

Technical Stage Department

Design

The overall design requirements for Into the New was a black box space with the option to have different backgrounds and floor colours.

See file below for individual production requirements.

Media:ITN_TSD_Production_Info.pdf

Ground Plans

Masking Plan

Equipment List

Fit Up/ Strike Plan

Fit Up Plan

Strike Plan

Show Running

Turnaround Document

Flys

Though the black box set-up was fairly simple, a few show specific elements required more specificity. The pink cloth and duvet had to nestle between bars 18 (Border) and 19 (Full Black) because of a lack of real estate in that area. We put a 12M bar on hemp and hauled them out and in by hand.

The pink wall flat ended up being substantially heavy and had to be loaded intermittently. Once the bar was taking tension on the lines, we had to load the cradle in that position. This is dangerous as it produces a significantly cradle heavy bar before it is taking the weight of the set element. Clipping and braking the bar are essential and "wrapping" the lines as it flys out is advised.

Below is flys documentation.

Flys & Hemp Plot

Points Plans

Points Plans

Sound

Design

The design for Into the New 2021 was a very simple yet tricky system. Sound for the show was targeted at different streaming platforms and recording platforms. This meant that we did not use the main PA system for the show as it was not necessary. Instead we used 4x Gentec speakers which were hired from the warehouse in Glasgow as operator speakers. This allowed us to send a program feed to the Snd op, LX op, DSM and then a spare one was for assessors to have thir own feed for Performances. We then sent a Left and Right mix of the show to the camera operators for their recordings, this was without vocals however as a clean vocal channel was sent to a separate camera so that it could be mixed in post.


Equipment List

Lighting