Ballet Showcase 2020 (Virtual Group B): Difference between revisions

From paperclip
Jump to navigation Jump to search
Ejohnstone (talk | contribs)
No edit summary
Ejohnstone (talk | contribs)
No edit summary
 
(23 intermediate revisions by the same user not shown)
Line 15: Line 15:
The aperture is 16m long truss line with 4 chain hoist pick up points. Hanging via track beneath the truss is a pair of hard maskers with specifically built extensions that allow for the truss to sit at the correct height for the half tab curtains while keeping the flats on the ground. This curtain and hard masker construction can be controlled via rope in the SL wing.
The aperture is 16m long truss line with 4 chain hoist pick up points. Hanging via track beneath the truss is a pair of hard maskers with specifically built extensions that allow for the truss to sit at the correct height for the half tab curtains while keeping the flats on the ground. This curtain and hard masker construction can be controlled via rope in the SL wing.
The vertical movement will be controlled by the HoF as they control a full black cloth on the bar in front. The smooth operation of this item will require practice between the SL operator and the HoF.  
The vertical movement will be controlled by the HoF as they control a full black cloth on the bar in front. The smooth operation of this item will require practice between the SL operator and the HoF.  
<pdf>Aperture.pdf</pdf>


'''Drawings'''
'''Drawings'''


Main ground plan. The plan shows the location of the set both on stage and off, in its wing storage position. The cloths and masking, alongside the aperture and FoH rigging.  
Hard Masking. This file focuses on the hard masking and the rigging point locations for it.


Hard Masking. This file focuses on the hard masking and the rigging point locations for it.
<pdf>Drawing1.pdf</pdf>


Soft masking. Again this file highlights specifically the soft masking rigging locations for ease of transfer to the grid
Soft masking. Again this file highlights specifically the soft masking rigging locations for ease of transfer to the grid
 
<pdf>Drawing2.pdf</pdf>
 
The Apeture and FoH. These are the truss structures for the production, both suspended via 1/2T loadguard motors.
The Apeture and FoH. These are the truss structures for the production, both suspended via 1/2T loadguard motors.
<pdf>Drawing3.pdf</pdf>
Main ground plan. The plan shows the location of the set both on stage and off, in its wing storage position. The cloths and masking, alongside the aperture and FoH rigging.
<pdf>Drawing4.pdf</pdf>




'''Risk Assessment'''
'''Risk Assessment'''


<pdf>RiskAssesment.pdf</pdf> 


'''Kit List'''
'''Kit List'''
[[File:KitList.pdf|600px|left|Fly Plot]]
 
<pdf>KitList.pdf</pdf>


'''Fit up plan'''
'''Fit up plan'''
The fit up plan took into consideration the 3 crew members and the Head of Flys as well as the LX dept. as we would be working with them in close quarters it would be most professional at this time to occupy ourselves with tasks that are thoroughly separate.
<pdf>FitUpPlan.pdf</pdf>


'''Fly Plot'''
'''Fly Plot'''
<pdf>FlyplotEJresit.pdf</pdf>


'''Points List'''
'''Points List'''
This is coulour coded to match up with the drawings further up this page.
<pdf>PointsList.pdf</pdf>

Latest revision as of 00:45, 7 August 2020


Technical Stage Department

Aperture

The aperture is designed to mimic its name sake in a camera, creating both, an almost impossibly small frame with the BP screen behind it and a large light full image. The aperture is 16m long truss line with 4 chain hoist pick up points. Hanging via track beneath the truss is a pair of hard maskers with specifically built extensions that allow for the truss to sit at the correct height for the half tab curtains while keeping the flats on the ground. This curtain and hard masker construction can be controlled via rope in the SL wing. The vertical movement will be controlled by the HoF as they control a full black cloth on the bar in front. The smooth operation of this item will require practice between the SL operator and the HoF.


Drawings


Hard Masking. This file focuses on the hard masking and the rigging point locations for it.

Soft masking. Again this file highlights specifically the soft masking rigging locations for ease of transfer to the grid

The Apeture and FoH. These are the truss structures for the production, both suspended via 1/2T loadguard motors.

Main ground plan. The plan shows the location of the set both on stage and off, in its wing storage position. The cloths and masking, alongside the aperture and FoH rigging.


Risk Assessment

Kit List

Fit up plan

The fit up plan took into consideration the 3 crew members and the Head of Flys as well as the LX dept. as we would be working with them in close quarters it would be most professional at this time to occupy ourselves with tasks that are thoroughly separate.

Fly Plot


Points List

This is coulour coded to match up with the drawings further up this page.