Ballet Showcase 2013: Difference between revisions

From paperclip
Jump to navigation Jump to search
Jbeggan (talk | contribs)
Rcoull (talk | contribs)
 
(24 intermediate revisions by 5 users not shown)
Line 21: Line 21:
|-
|-
|'''Lighting Designer'''
|'''Lighting Designer'''
|[[Adam Mccall]]
|[http://www.adammccall.co.uk Adam McCall]
|-  
|-  
|'''Stage Manager'''
|'''Stage Manager'''
Line 51: Line 51:
|}
|}


The Second Modern Ballet Showcase in The royal Conservatoire consisted of 6 short Pieces: Monad, Esquisses, Naomi's solo piece, Napoli, Georgia's Solo piece and The Reel
The Second Modern Ballet Showcase in The royal Conservatoire consisted of 6 short Pieces: Monad, Rite Of spring, Esquisses, Naomi's solo piece, Napoli, Georgia's Solo piece and The Reel


== Ground Plan ==
[[File:Ballet_gp.jpg]]
== Fly Plot ==
<pdf>Ballet_flyplot_jb.pdf</pdf>
== Fly Cue Sheet ==
<pdf>Ballet_Fly_Cue.pdf</pdf>


== The Masking ==
== The Masking ==
Line 74: Line 85:
We then knew we had to stretch it and after some discussion, we decided that dropping in tension wires form the grid was the best solution. The tension wires were dropped in and shackled onto a ring plate securely fastened to the stage floor directly under the hanging point. The other end of tension wire was then ratcheted off on the grid creating the tension.  
We then knew we had to stretch it and after some discussion, we decided that dropping in tension wires form the grid was the best solution. The tension wires were dropped in and shackled onto a ring plate securely fastened to the stage floor directly under the hanging point. The other end of tension wire was then ratcheted off on the grid creating the tension.  
We then made up pieces of cord with a shackle at one and and stretcher on the other. The Stretcher gripped on to the cloth and the shackled onto the tension wire, which sat 1m away from the cloth, in the wing. These were even place up the cloth allowing to be stretched on five points in each side. The shackle would run up the down the tension wire allowing the cloth to be easily flown in and out.
We then made up pieces of cord with a shackle at one and and stretcher on the other. The Stretcher gripped on to the cloth and the shackled onto the tension wire, which sat 1m away from the cloth, in the wing. These were even place up the cloth allowing to be stretched on five points in each side. The shackle would run up the down the tension wire allowing the cloth to be easily flown in and out.
== LX Side Booms ==
The Lx Booms were made up of 6 metre length scaff bars from stock. 8 of the tank traps from stock and t piece Kee Clamps also in stock.
A spot line was dropped in from the grid directly above the position, through a pulley and then cleated off on each fly floor.
Once the Boom was was fixed together, 1 crew on fly flor pulley up on spot line and 3 crew on stage taking the weight and guiding up on stage.
As per our Risk assessment showing that when using a fixed Kee clamp [[ManufactuersGuidelines]] state " At loads greater than 770kg consideration must be given to grub screw slippage"
Manufactures guidelines then state "Recommended set screw torque is 39Nm"
For this we purchased a torque spanner which is now available in stock tools.


== The Floor ==
== The Floor ==
Line 93: Line 114:




*'''Stage Manager''' - [[MArian Sharkey]]
*'''Stage Manager''' - [[Marian Sharkey]]
*'''Deputy Stage Manager''' - [[Rosie Barber]]
*'''Deputy Stage Manager''' - [[Rosie Barber]]


Line 102: Line 123:
*'''Chief Production Electrician''' - [[Ben Terry]]
*'''Chief Production Electrician''' - [[Ben Terry]]
*'''Deputy Production Electrician''' - [[Stuart Lord]]
*'''Deputy Production Electrician''' - [[Stuart Lord]]
*'''Lighting Operator and Programmer''' - [[Rebecca Coul]]
*'''Lighting Operator and Programmer''' - [[Rebecca Coull]]


*'''Sound Designer and Operator''' - [[Greame Brownl]]
*'''Sound Designer''' - [[Greame Brown]]


== Other ==
== Other ==

Latest revision as of 19:56, 25 June 2013


Modern Ballet Showcase 2013

Ballet Showcase 2013
Creative
Artistic Director Paul Tyers
Lighting Designer Adam McCall
Stage Manager Marian Sharkey
Deputy Stage Manager Rosie Barber
Technical Stage Manager John Beggan
Production Manager Sandy McRobbie
Stats
Venue New Athenaeum
Rehearsal Period April13-May '13
Tech Week 27th May'13
Performance Dates 7 JUN - 8 JUN 13

The Second Modern Ballet Showcase in The royal Conservatoire consisted of 6 short Pieces: Monad, Rite Of spring, Esquisses, Naomi's solo piece, Napoli, Georgia's Solo piece and The Reel

Ground Plan

Fly Plot

Fly Cue Sheet

The Masking

We used the New Athenaeum house Border and Tabs. The border on the winch bar and tabs on Flybar 1. Tabs would fly in and out between performances.

We had 3 borders on Bars 9,15 and 23.

We then masked the wings using dog legs. We dropped in spot lines from the grid using header blocks in the grid. We had 3 pick up points in the grid that would then cleat off on the each fly floor. Once each spot line was tied off to the dog leg bar would could raise to a suitable height in order to tie the 4x12m legs onto. Once tied on we had two crew on the fly floor raising up and one crew on Stage spotting. Legs are raised until you have enough cloth on stage to place a fly weight on. The legs were then neatly fixed to stage using a baton and fly weights to keep it stretched. We also found that by using a stretcher on back corner of each leg and tying it off to the counterweight cage and wall on p/s side wing, this also helped with straightening out the creases.

Scottish Ballet Cloth

The Cloth was also given to use by Scottish Ballet. This was hung on bar 24 in between the BP Screen and full black. This was to fly in for the final performance, The Reel.

Watering

As the cloth had not been used for quite some time we knew we may have to give it some attention. We hung long before any rehearsals in order to give it time to settle on the bar and let heat iron out some of the creases. We then each night before finishing sprayed with water and again left to settle over night. This was allowing it to settle a little better.

Stretching

We then knew we had to stretch it and after some discussion, we decided that dropping in tension wires form the grid was the best solution. The tension wires were dropped in and shackled onto a ring plate securely fastened to the stage floor directly under the hanging point. The other end of tension wire was then ratcheted off on the grid creating the tension. We then made up pieces of cord with a shackle at one and and stretcher on the other. The Stretcher gripped on to the cloth and the shackled onto the tension wire, which sat 1m away from the cloth, in the wing. These were even place up the cloth allowing to be stretched on five points in each side. The shackle would run up the down the tension wire allowing the cloth to be easily flown in and out.

LX Side Booms

The Lx Booms were made up of 6 metre length scaff bars from stock. 8 of the tank traps from stock and t piece Kee Clamps also in stock. A spot line was dropped in from the grid directly above the position, through a pulley and then cleated off on each fly floor. Once the Boom was was fixed together, 1 crew on fly flor pulley up on spot line and 3 crew on stage taking the weight and guiding up on stage.

As per our Risk assessment showing that when using a fixed Kee clamp ManufactuersGuidelines state " At loads greater than 770kg consideration must be given to grub screw slippage" Manufactures guidelines then state "Recommended set screw torque is 39Nm" For this we purchased a torque spanner which is now available in stock tools.

The Floor

As Done In Ballet 2012

The ballet floor has been borrowed from Scottish Ballet. It has been made up of four pieces of Harlaquin Cascade dance floor 12 metres by 2 metres laid lengthways across the stage. Then two pieces of Rosco dance floor along the sides to increase the overall width. Tim Plamer, the production manager for Scottish Ballet sent detail instructions of how to lay the floor which is now in the URE Book Laying Balletfloor.

The Screen

As Per Ballet 2012

A brand new back projection screen was ordered for the show. It measures 14x7m, it has eyelets at the top (the centre one is marked with a sharpie mark and a piece of white LX tape) and is double folded at the sides. It's pocket at the bottom is large enough for a piece of scaff and when weighted down with scaff and left floating very slightly it does not need stretching. The fasterners for the top of the screen are made by Gerriets and are called G-Quick. There are 69 of them and one marked centre.
The screen is very prone to damage so care must be taken when putting it up and taking it down. Instructions for taking it down and folding it can be found here; Folding the BP screen. It should also be insured lighting is a suitable distance away from the screen.

Production Team




Other