CPP-Red Line: Difference between revisions

From paperclip
Jump to navigation Jump to search
Etaylor (talk | contribs)
Created page with "Category:Productions Category:Drama Category:Chandler {| style=" border: 4px solid #FF0000; background-color: #FFFFFF; float: right; clear: right; margin: 2px; wi..."
 
 
(11 intermediate revisions by 3 users not shown)
Line 8: Line 8:


|-
|-
| align="center" | [[File:CoE.jpg]]''____________________________''
| align="center" | [[File:Redline.png|300px]]''____________________________''
{| style="background: none; width: 22em; margin: 0 auto;"
{| style="background: none; width: 22em; margin: 0 auto;"
|-
|-
Line 14: Line 14:
|-
|-
|'''Written by'''
|'''Written by'''
|William Shakespare
|CPP 2
|-
|-
|'''Director'''  
|'''Director'''  
|Peter Collins
|Caroline Bowditch
|-
|'''Designer'''
|[[Lisa Bertellotti]]
|-
|-
|'''Lighting Designer'''  
|'''Lighting Designer'''  
| Simon Hayes
| [[Michael Parkin]]
|-
|-
|'''Sound Designer'''  
|'''Sound Designer'''  
|[[Elleanor Taylor|Elleanor Taylor]]
|[[Graeme Brown]]
|-
|-


Line 35: Line 32:
|-
|-
|'''Performance Dates'''
|'''Performance Dates'''
| 7th - 9th November 2012
| 23rd - 24th May 2013
|}
|}
|}
|}
=='''Production Credits'''==
'''Production Manager''' [[Stephen Roe]]
== Stage Management ==
'''Stage Manager'''
'''Assistant Stage Manager''' [[Maciej Kopka]]
== Electrics ==
'''Chief Production Electrician''' [[Elleanor Taylor]]
'''Deputy Production Electrician''' [[Patrick Watson]]
'''Stage Electrician''' [[Ian Smyth]]
'''Lighting Operator and Programmer''' [[Elspeth Watt]]
==== Lighting Plan ====
'''Equipment List'''
''Lanterns''
S4 Jr Zoom 11
Acclaim Fresnel 18
Acclaim PC 6
Par Can 8
Pendant Lamps (With bulbs) 4
TW1 Mac 4
Speakers
Speaker Amount
Tannoy V12 4
Tannoy T40r 2
''Desks''
Strand 530i (c/w 2x Monitors) 1
Yamaha LS9 Digital Console 1
''Other Equipment''
Le Maitre MVS Hazer 1
1 x Bottle Haze Fluid 1
DI Boxes 2
Condenser Microphones 3
Dynamic Microphones 1
Peavey Stage Box 1
Microphone Stand 1
''Cables''
Jack to Jack Mono 2
3m TRS 19
5m TRS 28
16amp-15amp jump 4
2m 5 Pin DMX 5
5m 5 Pin DMX 3
10m 5 Pin DMX 2
1m Speakon 2
3m Speakon 2
9m Speakon 2
[[File:Lighting_Plan.pdf|950 px]]
== Sound ==
'''Operator''' [[Ian Smyth]]
[[File:Quick_Look_Band_Set_Up.docx|950 px]]
'''Sub placement:'''
2 x Tannoy T40r have been rigged in the middle of cat walk two.
The idea behind the placement of the subs is to aid any base that comes from the band and music. There are only two subs, as there is no demand or need for extra bass to come through the front of house mix.
'''FoH speaker placement:'''
4 x Tannoy V12 have been rigged as the FoH Mid-Top speakers. Two have been rigged for FoH left and the other two for FoH right. Each pair has been daisy chained. These speakers are to act as the core sound for the show. Due to the size of the venue only 4 FoH speakers are needed. Having FoH left and right, also means there is flexibility for any sound effects, music or band mix needing to come through different sides of the stage. They have also been placed in the middle of catwalk two, due to the set up of the tables and having the room separted sometimes during the performance. The speakers have also been daisy chained diagonally for left and right, as this gives the room more ‘balance’.
==Stage Tech==
For this show we were required to build a false grid into the venue under the catwalks to allow curtains to be dropped into place during the show.
'''Hardware used:
'''
''Curtains/Drifts (temp)
''
Main Tab (Downstage Bar of Catwalk 3)
*Tab 1200 MM (Chandler Black)
*Tarfor tension drift system
*2 Beam clamps
*2 shackles
Divider (Stage Right side – Underneath Catwalk 3)
*Tab (The longer white cyc 7500MM)
*Scaff 6.5M
*4 strops (1M)
*5 0.25T shackles
*5 barrel clamps
Divider (Stage Left Side – Between Catwalk 2 & 1 rolling bar)
*Tab (The shorter white cyc 40500MM)
*Scaff 4.5M
* 2 strops (1M)
* 3 0.25T shackles
* 3 barrel clamps
U/S – D/S Divider (All catwalks)
*Tab (12m Tab)
*Scaff 9.5M
*6 strops (1M)
*6 0.25T Shackles
*6 barrel clamps
''Tabs On Permanent Track
''
*Tab 12M U/S Wall (Ran on permeant triple e track)
*Tab (2 half tabs kimbled together) SR Wing
''Other Hardware
''
*6 pieces of 1M scaff clamped to scaff bars/lx bars to act as stability
*16 90 degree fixed scaff clamps

Latest revision as of 09:21, 12 December 2023


CPP-Red Line
____________________________
Creative
Written by CPP 2
Director Caroline Bowditch
Lighting Designer Michael Parkin
Sound Designer Graeme Brown
Stats
Venue Chandler
Performance Dates 23rd - 24th May 2013

Production Credits

Production Manager Stephen Roe

Stage Management

Stage Manager

Assistant Stage Manager Maciej Kopka

Electrics

Chief Production Electrician Elleanor Taylor

Deputy Production Electrician Patrick Watson

Stage Electrician Ian Smyth

Lighting Operator and Programmer Elspeth Watt

Lighting Plan

Equipment List

Lanterns

S4 Jr Zoom 11

Acclaim Fresnel 18

Acclaim PC 6

Par Can 8

Pendant Lamps (With bulbs) 4

TW1 Mac 4

Speakers

Speaker Amount

Tannoy V12 4

Tannoy T40r 2

Desks

Strand 530i (c/w 2x Monitors) 1

Yamaha LS9 Digital Console 1

Other Equipment

Le Maitre MVS Hazer 1

1 x Bottle Haze Fluid 1

DI Boxes 2

Condenser Microphones 3

Dynamic Microphones 1

Peavey Stage Box 1

Microphone Stand 1

Cables

Jack to Jack Mono 2

3m TRS 19

5m TRS 28

16amp-15amp jump 4

2m 5 Pin DMX 5

5m 5 Pin DMX 3

10m 5 Pin DMX 2

1m Speakon 2

3m Speakon 2

9m Speakon 2


File:Lighting Plan.pdf

Sound

Operator Ian Smyth

File:Quick Look Band Set Up.docx

Sub placement: 2 x Tannoy T40r have been rigged in the middle of cat walk two. The idea behind the placement of the subs is to aid any base that comes from the band and music. There are only two subs, as there is no demand or need for extra bass to come through the front of house mix.

FoH speaker placement: 4 x Tannoy V12 have been rigged as the FoH Mid-Top speakers. Two have been rigged for FoH left and the other two for FoH right. Each pair has been daisy chained. These speakers are to act as the core sound for the show. Due to the size of the venue only 4 FoH speakers are needed. Having FoH left and right, also means there is flexibility for any sound effects, music or band mix needing to come through different sides of the stage. They have also been placed in the middle of catwalk two, due to the set up of the tables and having the room separted sometimes during the performance. The speakers have also been daisy chained diagonally for left and right, as this gives the room more ‘balance’.


Stage Tech

For this show we were required to build a false grid into the venue under the catwalks to allow curtains to be dropped into place during the show.

Hardware used:

Curtains/Drifts (temp) Main Tab (Downstage Bar of Catwalk 3)

  • Tab 1200 MM (Chandler Black)
  • Tarfor tension drift system
  • 2 Beam clamps
  • 2 shackles

Divider (Stage Right side – Underneath Catwalk 3)

  • Tab (The longer white cyc 7500MM)
  • Scaff 6.5M
  • 4 strops (1M)
  • 5 0.25T shackles
  • 5 barrel clamps

Divider (Stage Left Side – Between Catwalk 2 & 1 rolling bar)

  • Tab (The shorter white cyc 40500MM)
  • Scaff 4.5M
  • 2 strops (1M)
  • 3 0.25T shackles
  • 3 barrel clamps

U/S – D/S Divider (All catwalks)

  • Tab (12m Tab)
  • Scaff 9.5M
  • 6 strops (1M)
  • 6 0.25T Shackles
  • 6 barrel clamps

Tabs On Permanent Track

  • Tab 12M U/S Wall (Ran on permeant triple e track)
  • Tab (2 half tabs kimbled together) SR Wing

Other Hardware

  • 6 pieces of 1M scaff clamped to scaff bars/lx bars to act as stability
  • 16 90 degree fixed scaff clamps