Candid Cabarets: Difference between revisions
Mmacdonald (talk | contribs) No edit summary |
Mmacdonald (talk | contribs) No edit summary |
||
Line 3: | Line 3: | ||
== Candid Cabarets == | == Candid Cabarets == | ||
==== Technical ==== | |||
'''Production Manager''' - Sam Ramsay | |||
'''Stage Manager''' - [[Rosanna Sutherland]] | |||
'''Technical Stage Manager''' - [[Melissa MacDonald]] | |||
'''Technical Stage Manager''' -[[Suzie Inglis]] | |||
'''Sound''' - [[Jevan Burchell]] | |||
'''Lighting Design/Production Electrician''' - [[Blair Omond]] | |||
'''Lighting Operator''' - [[Christopher McIntyre]] | |||
'''Swing Techs/ Crew''' - [[Graeme Brown ]], [[Jennifer Howes ]],[[Natalie Wilson ]], [[Christopher McIntyre ]],[[Patrick Watson ]], [[Oliver Gorman ]],[[Michael Parkin]] | |||
'''Video''' [[DF/TV]] | |||
== Technical Stage Management== | |||
This year's cabarets were quite different in comparison to previous years. We had an excellent opportunity to use our newly updated Automation desk [[EChameleon]], to move 4 LX Ladders vertically between various deads. | |||
As with [[Curtain Call Cabaret]] and [[Inner Space 2012]] we had a Lowered/False grid and brought in the iron, adding an intimate atmosphere to the space keeping the audeince and performance onstage. | |||
We constructed the False grid from 2 single purchase bars and 1 double purchase bar: 8, 15 and 22. These were cross-braced with three 6m scaff poles attached with swivel clamps. | |||
===Technical Challenges=== | |||
'''Moving motors:''' in order to rig the ladders we had to move the Automation motors. See [[Stage Automation Level 1]] for details of how to move them. This task require at least 6 people. | |||
== Electrics == |
Latest revision as of 10:00, 2 May 2012
Candid Cabarets
Technical
Production Manager - Sam Ramsay
Stage Manager - Rosanna Sutherland
Technical Stage Manager - Melissa MacDonald
Technical Stage Manager -Suzie Inglis
Sound - Jevan Burchell
Lighting Design/Production Electrician - Blair Omond
Lighting Operator - Christopher McIntyre
Swing Techs/ Crew - Graeme Brown , Jennifer Howes ,Natalie Wilson , Christopher McIntyre ,Patrick Watson , Oliver Gorman ,Michael Parkin
Video DF/TV
Technical Stage Management
This year's cabarets were quite different in comparison to previous years. We had an excellent opportunity to use our newly updated Automation desk EChameleon, to move 4 LX Ladders vertically between various deads. As with Curtain Call Cabaret and Inner Space 2012 we had a Lowered/False grid and brought in the iron, adding an intimate atmosphere to the space keeping the audeince and performance onstage.
We constructed the False grid from 2 single purchase bars and 1 double purchase bar: 8, 15 and 22. These were cross-braced with three 6m scaff poles attached with swivel clamps.
Technical Challenges
Moving motors: in order to rig the ladders we had to move the Automation motors. See Stage Automation Level 1 for details of how to move them. This task require at least 6 people.