Line 48: Line 48:
=Summary=
=Summary=
=Technical Stage=
=Technical Stage=
==Masking==
<span style="color:#808080">''For Masking on this production we ended up using the chandlers masking tracks all the way around the venue, plus two dead hung 4x4 blacks with the join in the middle to be used as an entrance and exit. We also had two dead hung 4x4's folded back to be 4x3 on the sides to mask off the doors.''</span>
==Main Set==
<span style="color:#808080">''The main set piece for this production comprised of 7 4x8 steel decks, 1 4x4 steel deck and a 4x4 trap door. The steel deck was all on 800 staff legs and was configured as seen below. The top of the steel deck was covered with painted stage floor 6x1200x2400 sheets and the front and SL/SR were also covered wit the same painted sheets being 6x800x1200mm.''</span>
===Ground Plan===
<pdf width="800" height="570">Shakes-Double-Bill-A2 PDF.pdf</pdf>
<pdf width="800" height="570">Shakes-Double-Bill-A2 PDF.pdf</pdf>
=Stage Management=
=Stage Management=
=Sound=
=Sound=
=Lighting=
=Lighting=

Latest revision as of 19:11, 12 February 2025


Hamlet x A Midsummer Night's Dream
File:***
Summary
Dates
***
Location
Chandler Theatre
Director
Alasdair Hunter
Production Team
Production Manager
Gavin Johnston
Stage Manager
Lee Davis
Deputy Stage Manager
Emily Robertson
Technical Stage Department
Stage Crew
***
Lighting Designer
Lighting Programmer
Production Electrician
Gun Lai
Deputy Production Electrician
Lighting Technicians
Sound Designer
Production Sound Engineer
Sound Technicians


Summary

Technical Stage

Masking

For Masking on this production we ended up using the chandlers masking tracks all the way around the venue, plus two dead hung 4x4 blacks with the join in the middle to be used as an entrance and exit. We also had two dead hung 4x4's folded back to be 4x3 on the sides to mask off the doors.

Main Set

The main set piece for this production comprised of 7 4x8 steel decks, 1 4x4 steel deck and a 4x4 trap door. The steel deck was all on 800 staff legs and was configured as seen below. The top of the steel deck was covered with painted stage floor 6x1200x2400 sheets and the front and SL/SR were also covered wit the same painted sheets being 6x800x1200mm.

Ground Plan

Stage Management

Sound

Lighting