Darren Wilson: Difference between revisions

From paperclip
Jump to navigation Jump to search
Dwilson (talk | contribs)
No edit summary
Rcoull (talk | contribs)
mNo edit summary
 
(139 intermediate revisions by one other user not shown)
Line 1: Line 1:
{| style=" border: 4px solid #006400; background-color: #FFffff; float: right; clear: right; margin: 2px; width: 22em;"
{| style=" border: 4px solid #0214B5; background-color: #FFffff; float: right; clear: right; margin: 2px; width: 22em;"
! style="background-color: #006400; font-size: 120%;" align="center" colspan="2"| <span style="color: #FFFFFF;">'''{{PAGENAME}}'''</span>
! style="background-color: #0214B5; font-size: 120%;" align="center" colspan="2"| <span style="color: #FFFFFF;">'''{{PAGENAME}}'''</span>
|-
|-
| align="center" | [[File:dwilson.jpg|200px]]
| align="center" | [[File:dwilson.jpg|200px]]
{| style="background: none; width: 22em; margin: 0 auto;"
{| style="background: none; width: 22em; margin: 0 auto;"
|-
|-
! style="background-color:  #006400; font-size: 120%;" align="center" colspan="2"| <span style="color: #FFFFFF;">'''Info'''</span>
! style="background-color:  #0214B5; font-size: 120%;" align="center" colspan="2"| <span style="color: #FFFFFF;">'''Info'''</span>
|-
|'''Date of Birth'''
|04th June 1997
|-
|-
|'''Course'''  
|'''Course'''  
Line 19: Line 16:
|Technical Stage Management  
|Technical Stage Management  
|-
|-
! style="background-color:#006400; font-size: 120%;" align="center" colspan="2"| <span style="color: #FFFFFF;">'''Education'''</span>
! style="background-color:#0214B5; font-size: 120%;" align="center" colspan="2"| <span style="color: #FFFFFF;">'''Education'''</span>
|-
|-
|'''Higher Education'''
|'''Higher Education'''
Line 27: Line 24:
|}
|}


Third Year Technical Stage Student @ [http://www.rcs.ac.uk RCS]
= Productions =
== Third Year ==
Stage Supervisor [[The Speculator]]
<gallery mode=packed-hover heights=200px>
Image:EP1.jpg|''Equipment Boxes''
Image:IMG_7474.jpg|''Fit up''
Image:TB5.jpg|''Truss Build''
Image:TB7.jpg|''Truss Build''
Image:TB1.jpg|''Motorbike in Place''
Image:IMG_7553.jpg|''Set''
Image:Spec Cast.jpg|''Cast''
</gallery>
Stage Supervisor- Flight
Flight was postponed in 2021 due to the Covid 19 Pandemic but parts of the set had already been built, Me and Ewan had completed all our paperwork and left the show to work on other things. It was then decided that parts of the set would be built on stage as part of a classroom project with the first year TSD's managing the project. I had the opportunity to help out during the week as i knew how the set went together.
<gallery mode=packed-hover heights=200px>
Image:Flightmini1.JPG|''Securing the tower flats''
Image:flightmini2.JPG|''Fit up''
Image:Flightmini3.JPG|''Fit up''
</gallery>
Stage Supervisor [[Into The New 2021]]
<gallery mode=packed-hover heights=200px>
Image:IMG 9285.JPG|''Flown pink wall''
Image:IMG_9287.JPG|''Very pink show''
Image:dance floor cleaning.JPG|''Cleaning the dance floor''
Image:ITN2.JPG|''Concert Rig''
</gallery>
Head of Flys & Automation [[Into The Woods 2021]]
<gallery mode=packed-hover heights=200px>
Image:ItwsetbuildJPG.jpeg|''Set build''
Image:itw.JPG|''LX truss''
Image:ITWGrid.jpg|''Grid Panels Removed''
Image:Into_the_Woods_Automation_Control.jpg|''Control Desk''
</gallery>
== Second Year ==
Stage Supervisor/ Head of Flys & Automation (Virtual Project) [[Ballet Showcase 2020 (Virtual Group A)]]
<gallery mode=packed-hover heights=200px>
Image:BS2.png|''Act 1- Black Masking''
Image:BS1.png|''Act 2- White Masking''
Image:BS3.png|''Act 1- Aperuture ''
</gallery>
Head of Flys & Automation [[Dialogues des Carmélites 2020]]
<gallery mode=packed-hover heights=200px>
Image:Screen Shot 2020-04-29 at 12.51.54.png|''TSD Team''
Image:Screen_Shot_2020-12-13_at_17.30.04.png|''Points Plan''
</gallery>
Deputy Stage Supervisor [[The Rape of Lucretia]]
<gallery mode=packed-hover heights=200px>
Image:Opera2rig.jpg|''Opera 2 rig''
Image:Opera2set.jpg|''Opera 2 set''
Image:opera2.JPG|''Opera 2''
</gallery>
Stage Supervisor [[CPP3 Collaborations 2019]]
<gallery mode=packed-hover heights=200px>
Image:Newmpt.jpg|''New self climbing towers''
Image:RS2 Venue 3.jpg|''Fit Up''
Image:RS2 Venue 5.jpg|''Ready to raise''
Image:RS2 Venue 8.jpg|''The venue''
Image:RS2 Venue 9.jpg|''Seating bank''
Image:RS2 Venue 11.jpg|''The venue''
Image:RS2 Venue 14.jpg|''Overhead rig''
</gallery>
Head of Flys/ Deputy Stage Supervisor [[Middletown]]
<gallery mode=packed-hover heights=200px>
Image:Middletownfoh.jpg|''FOH truss''
Image:Middletownbridge.jpg|''Building the bridge''
Image:Bridge1.jpg|''Middletown Set''
Image:Soiltrap2.jpg|''Soil trap''
Image:middletown3.jpg|''Tech''
Image:Middletowncast.jpg|''Middletown Crew''
</gallery>
== First Year ==
Sound Technician [[Ballet Showcase 2019]]
<gallery mode=packed-hover heights=200px>
Image:balletteam.JPG|''Ballet Cast & Crew 2019''
Image:ballet2.JPG|''Ballet Dreamgirls Set''
</gallery>
Assistant Stage Manager [[San Diego]]
<gallery mode=packed-hover heights=200px>
Image:sandiegoprops.JPG|''San Diego Props Table''
Image:sandiegoteam.JPG|''San Diego Crew''
</gallery>
LX Technician [[Sunday in the Park with George]]
<gallery mode=packed-hover heights=200px>
Image:sundayrig.JPG|''Fit Up''
Image:sundayteam.JPG|''LX Team''
Image:Sundayrig2.jpg|''Overhead Rig''
</gallery>
Technical Stage Supervisor [[Inner Space 2019]]
<gallery mode=packed-hover heights=200px>
Image:innerspace2.JPG|''Inner Space Race Build 2019''
Image:innerspace1.jpg|''Inner Space Race 2019'
Image:Innerspacecrew.JPG|''Class of 2021''
</gallery>
Assistant Technical Stage Supervisor [[Peter Pan]]
<gallery mode=packed-hover heights=200px>
Image:peterpanset.JPG|''Peter Pan Set 2018''
Image:Peterpan.jpg|''Grid Rig''
Image:Peterpanfoh.jpg|''FOH Truss''
Image:peterpancrew.JPG|''Peter Pan Crew 2018''
</gallery>
= RCS Projects =
== Floor Cleaning Cupboard ==
The floor cleaning cupboard was designed to accommodate all the new dance floor cleaning supplies purchased in March 2021.
<gallery mode=packed-hover heights=300px>
Image:cupboardbuild.JPG|''Building the frame''
Image:cupboardcomplete.jpg|''Frame with door attached''
Image:cleaningcupboardpic.jpg|''Cupboard finished''
</gallery>
<pdf width="1000" height="800">Darren_Wilson_Cleaning_Cupboard_V2_Plan.pdf</pdf>
== Negotiated Project- Organiser Trolley ==
This was the main part of my Negotiated Project, build an organiser trolley that could hold Euro crates and organiser cases.
<gallery mode=packed-hover heights=200px>
Image:NEWTROLLEY.JPG|''Complete Trolley''
Image:newtrolley2.JPG|''Complete Trolley''
Image:trolley3.jpg|''Joints''
Image:Trolley4.jpg|''Empty Trolley''
Image:trolley5.jpg|''Joints''
</gallery>
== Kinesys Grid Sled ==
The Kinesys grid sled was designed so that instead of having 3 people lifting the chain hoists across the grid (something that involves working in very close proximity with other people) the chain hoists could instead be pulled/ pushed across the grid. This would allow for people to keep 2m distancing and would also make it easier to move the hoists.
This initially was going to be a quick build using stuff we could repurpose but once i got started building the project turned into a labour of love. The main part of the sled was an old wooden box (used to store black tat) which i cut down in size, sanded and stuck some skates on the bottom. After that i started adding extras to the sled like cut out supports so the hoists would sit neatly in the box and cut out a section at the side of the box to allow the cable to sit freely. I also added some handles and routed all the edges so the sled was more user friendly.
The sled also allows for the chain to be kept together when rigging the hoist as before the chain would have to be kept in the bag and would mean that the 3rd person would normally have to keep a hold of the bag whilst the motor was being rigged.
In practice during Giulio Cesare pre rig day the sled was put to the test and it took one person to move a hoist across the grid, something that before would have taken 3.
<gallery mode=packed-hover heights=250px>
Image:IMG_7620.jpg|''Routing Complete''
Image:IMG_7855.jpg|''Ground Test''
Image:Gridsled3.jpg|''Grid Sled in Action''
</gallery>
== Conduit Holder ==
During summer 2019 new drapes and conduit were purchased. In order to keep the now large stock of conduit in order I set about building a holder that would be secured on to the wall. The holder would have sections for 1m, 0.5m and compartments for joiners and bullet ends, an additional Kee clamp support would also be fixed to the wall to hold 2m sections of conduit.
<gallery mode=packed-hover heights=200px>
Image:h1.jpg|''Building the holder''
Image:Conduitholder2.jpg|''Mounted to the wall''
Image:Conduitholder1.jpg|''Complete''
Image:Conduitholder3.jpg|''New Markers''
Image:Conduitholder4.jpg|''Complete''
</gallery>
== Dance Floor Trolley ==
As part of our 2nd year construction projects I was tasked with designing a new dance floor trolley that could hold 10 rolls, 4 rolls more than the other trolley. I started by looking at different designs of trolleys that were available to purchase. All of them had their pros and cons but for what we needed the design of our existing trolley- built by Stuart Leech was perfect, although it needed to be higher to fit the extra rolls. After drawing the trolley up on Vectorworks and working out exactly how big it would need to be, i made up a cutting list and was all set to start building however due to Covid 19 I never got the chance to build the trolley but during the summer Matt got it finished.
<gallery mode=packed-hover heights=200px>
Image:DF4.png|''VW Drawing''
Image:DF1.JPG|''Built by Matt''
Image:DF2.JPG|''New Trolley''
</gallery>
= External Work =
Apex Acoustics Sound Services [https://www.apexacoustics.com]
Five Star Crew [https://fivestarcrew.co.uk]
Gallowglass [https://www.gallowglass.com]
<gallery mode=packed-hover heights=200px>
Image:Hydro6.jpg|''The Steamie Fit Up''
Image:Hydro3.jpg|''The Steamie Fit Up''
Image:Hydro5.jpg|''M'elodie Centre Hang''
Image:Hydro4.JPG|''The Steamie Sound Rig''
Image:Hyrdo2.JPG|''Sean Paul Strike''
Image:Hydro7.JPG|''Sean Paul Strike''
Image:liveatthelinks.JPG|''Live at The Links Strike''
Image:kaiserchiefs.JPG|''Kaiser Chiefs''
Image:Apex1.JPG|''Private Party Rig''
Image:party.JPG|''Private Party''
Image:Apex3.JPG|''Food Festival Rig''
Image:foodfestival1.JPG|''M'elodie Line Array''
Image:Murray1.JPG|''Murrayfield Pitch Screen Rig''
Image:Murray2.JPG|''Murrayfield Pitch Screen Rig''
Image:apex2.jpg|''Private Talent Show''
Image:Summersessions.JPG|''Summer Sessions Rig''
Image:Rewind2.JPG|''Rewind Rig''
Image:Rewind.JPG|''Rewind Rig''
Image:Rewind3.JPG|''M'elodie Line Array- Dundee Fireworks''
Image:apex4.jpg|''V&A Dundee Private Party''
</gallery>
= Other Pages =
[[Self Climbing Truss]]- Created to list the stock and process of building the self climbing truss structure.
= Useful Pages =
Animated Knots [https://www.animatedknots.com/]
Tait [http://www.taittowers.com]


Kinesys [https://www.kinesys.com/resources/]


Prolyte Campus [https://www.prolyte.com/en/prolyte-campus/]


I am a first year technical stage management student at [http://www.rcs.ac.uk RCS]
Sixty 82 [https://www.sixty82.nl]


== Productions ==
Theatre Art Life [https://www.theatreartlife.com]


[[Peter Pan 2018]]
Area 4 [https://www.a4i.tv]

Latest revision as of 13:58, 4 June 2024

Darren Wilson
Info
Course Production Technology & Management
Graduating Year 2021 (RCS Graduate 21)
Specialism Technical Stage Management
Education
Higher Education Royal Conservatoire of Scotland 2018 - 2021

Third Year Technical Stage Student @ RCS

Productions

Third Year

Stage Supervisor The Speculator


Stage Supervisor- Flight

Flight was postponed in 2021 due to the Covid 19 Pandemic but parts of the set had already been built, Me and Ewan had completed all our paperwork and left the show to work on other things. It was then decided that parts of the set would be built on stage as part of a classroom project with the first year TSD's managing the project. I had the opportunity to help out during the week as i knew how the set went together.


Stage Supervisor Into The New 2021


Head of Flys & Automation Into The Woods 2021

Second Year

Stage Supervisor/ Head of Flys & Automation (Virtual Project) Ballet Showcase 2020 (Virtual Group A)

Head of Flys & Automation Dialogues des Carmélites 2020


Deputy Stage Supervisor The Rape of Lucretia

Stage Supervisor CPP3 Collaborations 2019

Head of Flys/ Deputy Stage Supervisor Middletown

First Year

Sound Technician Ballet Showcase 2019


Assistant Stage Manager San Diego


LX Technician Sunday in the Park with George


Technical Stage Supervisor Inner Space 2019

Assistant Technical Stage Supervisor Peter Pan

RCS Projects

Floor Cleaning Cupboard

The floor cleaning cupboard was designed to accommodate all the new dance floor cleaning supplies purchased in March 2021.


Negotiated Project- Organiser Trolley

This was the main part of my Negotiated Project, build an organiser trolley that could hold Euro crates and organiser cases.

Kinesys Grid Sled

The Kinesys grid sled was designed so that instead of having 3 people lifting the chain hoists across the grid (something that involves working in very close proximity with other people) the chain hoists could instead be pulled/ pushed across the grid. This would allow for people to keep 2m distancing and would also make it easier to move the hoists.

This initially was going to be a quick build using stuff we could repurpose but once i got started building the project turned into a labour of love. The main part of the sled was an old wooden box (used to store black tat) which i cut down in size, sanded and stuck some skates on the bottom. After that i started adding extras to the sled like cut out supports so the hoists would sit neatly in the box and cut out a section at the side of the box to allow the cable to sit freely. I also added some handles and routed all the edges so the sled was more user friendly.

The sled also allows for the chain to be kept together when rigging the hoist as before the chain would have to be kept in the bag and would mean that the 3rd person would normally have to keep a hold of the bag whilst the motor was being rigged.

In practice during Giulio Cesare pre rig day the sled was put to the test and it took one person to move a hoist across the grid, something that before would have taken 3.

Conduit Holder

During summer 2019 new drapes and conduit were purchased. In order to keep the now large stock of conduit in order I set about building a holder that would be secured on to the wall. The holder would have sections for 1m, 0.5m and compartments for joiners and bullet ends, an additional Kee clamp support would also be fixed to the wall to hold 2m sections of conduit.


Dance Floor Trolley

As part of our 2nd year construction projects I was tasked with designing a new dance floor trolley that could hold 10 rolls, 4 rolls more than the other trolley. I started by looking at different designs of trolleys that were available to purchase. All of them had their pros and cons but for what we needed the design of our existing trolley- built by Stuart Leech was perfect, although it needed to be higher to fit the extra rolls. After drawing the trolley up on Vectorworks and working out exactly how big it would need to be, i made up a cutting list and was all set to start building however due to Covid 19 I never got the chance to build the trolley but during the summer Matt got it finished.

External Work

Apex Acoustics Sound Services [1]

Five Star Crew [2]

Gallowglass [3]

Other Pages

Self Climbing Truss- Created to list the stock and process of building the self climbing truss structure.

Useful Pages

Animated Knots [4]

Tait [5]

Kinesys [6]

Prolyte Campus [7]

Sixty 82 [8]

Theatre Art Life [9]

Area 4 [10]