Into The New 2021: Difference between revisions
No edit summary |
|||
(22 intermediate revisions by 3 users not shown) | |||
Line 12: | Line 12: | ||
|'''Performance Dates''' <div style="text-align: centre;"> 2nd March - 13th March </div> | |'''Performance Dates''' <div style="text-align: centre;"> 2nd March - 13th March </div> | ||
|- | |- | ||
|'''Online Showing Dates''' <div style="text-align: centre;"> | |'''Online Showing Dates''' <div style="text-align: centre;"> 25th March - 28th March </div> | ||
|- | |- | ||
|'''Performance Course''' <div style="text-align: centre;"> 4th Year Contemporary Performance Practice </div> | |'''Performance Course''' <div style="text-align: centre;"> 4th Year Contemporary Performance Practice </div> | ||
Line 79: | Line 79: | ||
==Technical Stage Department== | ==Technical Stage Department== | ||
<gallery mode=packed-hover heights=200px> | |||
Image:IMG 9285.JPG|''Flown pink wall'' | |||
Image:IMG_9287.JPG|''Very pink show'' | |||
Image:ITN2.JPG|''Concert Rig'' | |||
</gallery> | |||
===Design=== | ===Design=== | ||
The overall design requirements for Into the New | The overall design requirements for Into the New was a black box space with the option to have different backgrounds and floor colours. | ||
See file below for individual production requirements. | |||
[[Media:ITN_TSD_Production_Info.pdf]] | |||
=== Ground Plans === | === Ground Plans === | ||
<pdf></pdf> | <pdf width="700" height="500">Into_The_New-_Ground_Plan.pdf</pdf> | ||
<pdf width="700" height="500">ITN-_Overhead_Plan_.pdf</pdf> | |||
=== Masking Plan === | === Masking Plan === | ||
<pdf></pdf> | <pdf width="900" height="700">Into_The_New-_Masking_Plan.pdf</pdf> | ||
=== Equipment List === | === Equipment List === | ||
<pdf></pdf> | <pdf width="700" height="900">ITN_Equipment_List_.pdf</pdf> | ||
=== Fit Up/ Strike Plan === | === Fit Up/ Strike Plan === | ||
Line 103: | Line 115: | ||
=== Show Running === | === Show Running === | ||
''' | '''Turnaround Document''' | ||
<pdf></pdf> | <pdf>ITN_Turnaround_Schedule.pdf</pdf> | ||
=== Flys === | |||
Though the black box set-up was fairly simple, a few show specific elements required more specificity. The pink cloth and duvet had to nestle between bars 18 (Border) and 19 (Full Black) because of a lack of real estate in that area. We put a 12M bar on hemp and hauled them out and in by hand. | |||
The pink wall flat ended up being substantially heavy and had to be loaded intermittently. Once the bar was taking tension on the lines, we had to load the cradle in that position. This is dangerous as it produces a significantly cradle heavy bar before it is taking the weight of the set element. Clipping and braking the bar are essential and "wrapping" the lines as it flys out is advised. | |||
Below is flys documentation. | |||
==== Flys & Hemp Plot ==== | ==== Flys & Hemp Plot ==== | ||
<pdf></pdf> | <pdf>ITTN_Hemp_Plot.pdf</pdf> | ||
<pdf>ITNN_Master_Fly_Plot.pdf</pdf> | |||
==== Points Plans ==== | ==== Points Plans ==== | ||
'''Points Plans''' | '''Points Plans''' | ||
<pdf></pdf> | <pdf>ITTN_-_Points_Plan.pdf</pdf> | ||
==Sound== | |||
''' | ==='''Design'''=== | ||
The design for Into the New 2021 was a very simple yet tricky system. Sound for the show was targeted at different streaming platforms and recording platforms. This meant that we did not use the main PA system for the show as it was not necessary. Instead we used 4x Gentec speakers which were hired from the warehouse in Glasgow as operator speakers. This allowed us to send a program feed to the Snd op, LX op, DSM and then a spare one was for assessors to have thir own feed for Performances. We then sent a Left and Right mix of the show to the camera operators for their recordings, this was without vocals however as a clean vocal channel was sent to a separate camera so that it could be mixed in post. | |||
==='''Equipment List'''=== | |||
<pdf width="700" height="900">Into_the_New_Equipment_List_.pdf</pdf> | |||
==Lighting== | ==Lighting== |
Latest revision as of 12:40, 24 May 2021
Overview
Shows/ Cast
Stage Management
Technical Stage Department
-
Flown pink wall
-
Very pink show
-
Concert Rig
Design
The overall design requirements for Into the New was a black box space with the option to have different backgrounds and floor colours.
See file below for individual production requirements.
Media:ITN_TSD_Production_Info.pdf
Ground Plans
Masking Plan
Equipment List
Fit Up/ Strike Plan
Fit Up Plan
Strike Plan
Show Running
Turnaround Document
Flys
Though the black box set-up was fairly simple, a few show specific elements required more specificity. The pink cloth and duvet had to nestle between bars 18 (Border) and 19 (Full Black) because of a lack of real estate in that area. We put a 12M bar on hemp and hauled them out and in by hand.
The pink wall flat ended up being substantially heavy and had to be loaded intermittently. Once the bar was taking tension on the lines, we had to load the cradle in that position. This is dangerous as it produces a significantly cradle heavy bar before it is taking the weight of the set element. Clipping and braking the bar are essential and "wrapping" the lines as it flys out is advised.
Below is flys documentation.
Flys & Hemp Plot
Points Plans
Points Plans
Sound
Design
The design for Into the New 2021 was a very simple yet tricky system. Sound for the show was targeted at different streaming platforms and recording platforms. This meant that we did not use the main PA system for the show as it was not necessary. Instead we used 4x Gentec speakers which were hired from the warehouse in Glasgow as operator speakers. This allowed us to send a program feed to the Snd op, LX op, DSM and then a spare one was for assessors to have thir own feed for Performances. We then sent a Left and Right mix of the show to the camera operators for their recordings, this was without vocals however as a clean vocal channel was sent to a separate camera so that it could be mixed in post.
Equipment List