Burial At Thebes: Difference between revisions

From paperclip
Jump to navigation Jump to search
No edit summary
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
[[Category:Productions]]
http://paperclip.rcs.ac.uk/index.php/The_Burial_at_Thebes#Summary
 
[[Category:Play]]
 
 
{| style=" border: 4px solid #000000; background-color: #FFFFFF; float: right; clear: right; margin: 2px; width: 30em;"
! style="background-color: #000000; font-size: 120%;" align="center" colspan="2"| <span style="color: #FFFFFF;">'''{{PAGENAME}}'''</span>
|-
| align="center" |
{| style="background: none; width: 22em; margin: 0 auto;"
|-
! style="background-color: #000000; font-size: 120%;" align="center" colspan="2"| <span style="color: #FFFFFF;">'''Performance Time'''</span>
|-
|'''Performance Dates'''
|1st - 4th November 2016 (7 performances)
|-
! style="background-color:#000000; font-size: 120%;" align="center" colspan="2"| <span style="color: #FFFFFF;">'''Stats'''</span>
|-
|'''Venue'''
|[[New Athenaeum Theatre]]
|-
! style="background-color:#000000; font-size: 120%;" align="center" colspan="2"| <span style="color: #FFFFFF;">'''Creative Team'''</span>
|-
|'''Technical Manager'''
|[[Gillian Slater]]
|-
|'''Lighting Designer'''
|[[Benjamin Goodman]]
|-
|'''Sound Designer'''
|[[Jamie Ford]]
|-
|'''Stage Manager'''
|[[Chariya Glasse-Davies]]
|-
|'''Production Electrician'''
|[[Gary Ashbridge]]
|-
|'''Technical Stage Manager'''
|[[Ben Leach]]
|-
|'''Deputy Stage Manager''
|[[Miranda Stewart]]
|-
|'''Production Manager Manager'''
|[[Stephen Roe]]
|-
|}
|}
 
==Summary==
 
==Stage Management==
 
==Lighting==
 
Lighting was designed by [[Benjamin Goodman]]. The Production Electrician was [[Gary Ashbridge]]. Board Operator (GrandMA1) [[Euan Odd]. LX Crew [[Stephen Keenan]] and [[Reece Flynn]]
 
The design was of a small nature and consisted of approximately 60-70 fixtures. See plan below.
 
There was 8 Fluorescent Tube light fittings. These were loaned from the Citizen Theatre via the Technical Manager - Stuart Jenkins. The units were standard fluorescent light houses with LED tape in plastic tubing to represent the fluorescent tube. These were on a 16-bit LED driver which mean we had very smooth dimming control of each unit.
 
There was a 5Kw Fresnel on a tracking system designed in collaboration with the PLX and TSM. See TSM plans for a detailed description but the idea was to have the 5Kw lamp to represent time passing - the sun setting. This was behind gaps in the set which represented windows. The effect worked really well.
 
Below is the Master Patch for the production.
 
==Sound==
 
==TSM==

Latest revision as of 23:51, 16 November 2016