Comedy of Errors: Difference between revisions
No edit summary |
|||
(6 intermediate revisions by 2 users not shown) | |||
Line 3: | Line 3: | ||
[[Category:Chandler]] | [[Category:Chandler]] | ||
{| style=" border: 4px solid # | {| style=" border: 4px solid #C4C4C4; background-color: #FFFFFF; float: right; clear: right; margin: 2px; width: 22em;" | ||
! style="background-color: # | ! style="background-color: #C4C4C4; font-size: 120%;" align="center" colspan="2"| <span style="color: #000066;">'''{{PAGENAME}} '''</span> | ||
|- | |- | ||
Line 11: | Line 11: | ||
{| style="background: none; width: 22em; margin: 0 auto;" | {| style="background: none; width: 22em; margin: 0 auto;" | ||
|- | |- | ||
! style="background-color: # | ! style="background-color: #C4C4C4; font-size: 120%;" align="center" colspan="2"| <span style="color: #000066;">'''Creative'''</span> | ||
|- | |- | ||
|'''Written by''' | |'''Written by''' | ||
Line 20: | Line 20: | ||
|- | |- | ||
|'''Designer''' | |'''Designer''' | ||
|[[Lisa | |[[Lisa Bertellotti]] | ||
|- | |- | ||
|'''Lighting Designer''' | |'''Lighting Designer''' | ||
Line 29: | Line 29: | ||
|- | |- | ||
! style="background-color:# | ! style="background-color:#C4C4C4; font-size: 120%;" align="center" colspan="2"| <span style="color: #000066;">'''Stats'''</span> | ||
|- | |- | ||
|'''Venue''' | |'''Venue''' | ||
Line 58: | Line 58: | ||
''' | '''Chief Production Electrician''' [[Alice McKay]] | ||
'''Deputy Production Electrician''' [[ Oliver Gorman]] | '''Deputy Production Electrician''' [[Oliver Gorman]] | ||
'''Electrician''' [[Michael Parkin]] | '''Stage Electrician''' [[Michael Parkin]] | ||
'''Lighting Operator and Programmer''' [[Sam Cunningham]] | |||
==== Lighting Plan ==== | |||
[[File:Comedy of Errors LX Plan.png|950 px]] | |||
== Sound == | == Sound == | ||
Line 139: | Line 145: | ||
4x 13 amp extensions | 4x 13 amp extensions | ||
'''Band''' | |||
[[File:Band.jpeg]] | |||
The Band was located upstage left. The Peavey Stage Box was used for this. This meant it was easy to plug up the band. It also meant that the sound desk had to be moved, so you could hear to mix. Due to the size of the space, it was quite a challenge, as there was no control over volume for the drums and saxophone. | |||
All the instruments were sourced by stage management or personal belongings of cast members. | |||
The band consisted of: | |||
1x Fender Cyclone Electric Guitar | |||
1x Yamaha APX900 NAT B Electric Acoustic Guitar | |||
1 x Boss ME-50 Guitar Multiple Effects | |||
1 x Yamaha portable Grand DGX 500 | |||
1x Saxophone | |||
1x Microphone | |||
---- | ---- | ||
Latest revision as of 23:28, 14 March 2013
Comedy of Errors | ||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
____________________________
|
Production Credits
Production Manager Sandy McRobbie
Stage Management
Stage Manager Dougal Gudim
Assistant Stage Manager Jane Paterson
Stage
Technical Stage Managers Rebecca Coull & Melissa MacDonald
Electrics
Chief Production Electrician Alice McKay
Deputy Production Electrician Oliver Gorman
Stage Electrician Michael Parkin
Lighting Operator and Programmer Sam Cunningham
Lighting Plan
Sound
Design and operator Elleanor Taylor
System Design Details
Sub placement:
2 x Tannoy T40r were rigged towards the front of the seating bank, stage left and right respectively.
The idea behind the placement of the subs is to aid any base that comes from the band and music. There are only two subs, as there is no demand or need for extra bass to come through the front of house mix.
FoH speaker placement:
4 x Tannoy V12 were rigged as the FoH Mid-Top speakers. Two were rigged for FoH left and the other two for FoH right. Each pair were daisy chained. These speakers were act as the core sound for the show. Due to the size of the venue only four FoH speakers are needed. Having FoH left and right also means there is flexibility for any sound effects, music or band mix needing to come through different sides of the stage.
Desk placement:
For the technical rehearsal the desk was brought down and placed towards the top of seating bank, stage right. This meant levels for the band could be set accurately relative to the audience.
After the first dress rehearsal, the desk was moved to the galleries (second level in the Chandler stage right). This meant that the operator could still hear some of the mix and music, compared to the only other option of the sound booth, where the mix and music heard would be very limited. It also meant that the operator could change the levels if need be by ‘ear’.
EV S200 Speaker Placement:
The purpose behind this speaker is so the cast could hear the song for ‘Syracusia’. This is important as they need to be in tune.
Sound Equipment List
Equipment Venue Specific:
4 x Tannoy V12
2 x Tannoy T40r
1 x Yamaha LS9 Digital Console
Booked Equipment from Venue Stock at Royal Conservatoire of Scotland:
1x EV S200
3x SRM150 Mackie Monitors
1 X Shure 55sh
3x BSS Audio AR 133
1 x Peavey Audio Link 16 by 4 Stage Box
4x 5m Jack to Jack Mono Cables
4x 5m XLR Cable
9 x 10m XLR Cable
4 x 9.5m Speakon Cable
4 x 5m Speakon Cable
1 x Round Microphone Stand
2x Large Boom Stands
4x 13 amp extensions
Band
The Band was located upstage left. The Peavey Stage Box was used for this. This meant it was easy to plug up the band. It also meant that the sound desk had to be moved, so you could hear to mix. Due to the size of the space, it was quite a challenge, as there was no control over volume for the drums and saxophone.
All the instruments were sourced by stage management or personal belongings of cast members.
The band consisted of:
1x Fender Cyclone Electric Guitar
1x Yamaha APX900 NAT B Electric Acoustic Guitar
1 x Boss ME-50 Guitar Multiple Effects
1 x Yamaha portable Grand DGX 500
1x Saxophone
1x Microphone
Technical Stage Management
Floating Suitcase
Up stage left a suitcase was to float in an 'open' position. We attached a drift through the lining that ran along infront of the ringes and then up to a bar. To hold it in a upright position we attached a line of sash to the handle and attached that to the bar above.
Equipment List | |
---|---|
x1 3 meter Drift | |
x2 1/4 tonne shackles | |
x1 sash @ 1.5 meters | |
x1 Screw eye. Size 213 |
This was rigged in consolation with Electrics, as it was designed to look like the strings of Festoon were bursting out
|-
Washing line
The washing line was rigged using sash and pulleys. It was attached to the back of the wooden trunks with a screw eye. Cast attached the washing lines to pre set sash lines UCS and DSR ( using snap hooks attached to the washing lines )at the relevant point in the show- they were then taken out by the operator from the gantry at catwalk 3 and cleated off using a swivel clamp as a cleat.